Application fees in Glasgow City Council run £151–£480, plus the safety certificates every Scottish short-term let needs. Confirm current fees on the official council page.
Licence fees
Glasgow City Council Fees
| Fee band | Application | Renewal |
|---|---|---|
| Home Letting or Home Sharing (or both) — max occupancy 4 or under | £151 | £90 |
| Home Letting or Home Sharing (or both) — max occupancy 5 or more | £331 | £270 |
| Secondary Letting — max occupancy 4 or under | £301 | £240 |
| Secondary Letting — max occupancy 5 or more | £480 | £420 |
Variation application: £87 flat fee for all four licence types (grant, secondary letting, home letting, home sharing) regardless of occupancy band — see policy section 14.2 if the variation itself changes maximum occupancy. Fees are non-refundable and payable only by BACS transfer to Glasgow City Council's Licensing account (quoting the 16-digit ST reference); the application is not formally lodged until payment clears. These are the CURRENT figures confirmed from the council's live page (page states 'Last modified on 21 August 2025', captured in a Wayback Machine snapshot dated 18 Jan 2026 — the live site returned HTTP 403 to automated fetches during this check, including curl with a browser user-agent, so the archived copy was used). This supersedes the 2023/24 schedule (Secondary £250/£400, Home Letting/Sharing £125/£275, renewals £200/£350 and £75/£225, variation £75) that still surfaces in some third-party summaries and search snippets — do not use those older figures.
No separate planning permission needed
Glasgow has NOT designated any short-term let control area under s.26B of the Town and Country Planning (Scotland) Act 1997 (confirmed via the council's own Planning-and-STL guidance page, wayback snapshot 23 Apr 2025 — no more recent snapshot found but no news of a designation since). This means the mandatory "planning permission in force/pending" licence condition is currently dormant for Glasgow (it only bites in a designated control area). However, planning permission can still separately be required outside a control area: the council's policy (SG10, City Development Plan) treats flats as a Sui Generis use, so letting an ENTIRE flat frequently as an STL is likely to need planning permission (fee ~£600 per 100 sqm, or half that for a Certificate of Lawfulness for Proposed Use), whereas letting a HOUSE to a single household generally does not need planning permission. A 10-year continuous-use exemption route (Certificate of Lawfulness for Existing Use) exists for long-running flats. This planning process is entirely separate from and additional to the STL licence.
Before you apply
Documents You'll Need
- Floor/layout plan showing rooms (living areas, all bedrooms and which bedrooms are available to guests), room dimensions, and location of stairs — required for all new grant applications regardless of licence type
- Floor plan NOT required for a renewal if there has been no change to the layout since the last licence
- Floor plan IS required for a variation application if the variation involves a layout change
- Written consent from the property owner(s) — only needed where the applicant is not the owner; if there is shared/multiple ownership, a signed consent declaration is needed from every owner
- Statutory public site notice displayed at/near the premises for 21 consecutive days during determination, inviting objections/representations
Safety certificates
Certificates Required
Your Glasgow City Council licence application must be backed by current safety certificates. These are jobs for a certified assessor, and getting them booked early is the most common thing that holds an application up.
Get your licence certificates sorted
A short-term let licence in Glasgow City Council needs a set of safety certificates. Tell us about your property and we'll connect you with a local certified assessor for a no-obligation quote.
Enquiry sent
Thanks. A local assessor will be in touch about your certificates.
Local conditions
Key Rules in Glasgow City Council
- No STL control area is currently designated in Glasgow, unlike Edinburgh's citywide control area
- Four licence types: Secondary Letting, Home Letting, Home Sharing, and Home Letting + Home Sharing combined — the applicant must pick one at application
- Since 1 January 2025 all hosts must hold an STL licence (transitional 'grandfather' operating rights for pre-Oct-2023 applicants ended)
- Statutory 21-day public site notice for every application, plus mandatory consultation with Police Scotland, Scottish Fire and Rescue Service, the local Community Council and ward councillors
- Fees are non-refundable and must be paid by BACS transfer — the application is not formally lodged until payment clears
- Planning permission is a separate regime from the STL licence; flats let in their entirety are far more likely to need it than houses let to a single household
- A property continuously operated as an STL for 10+ years or more may qualify for a Certificate of Lawfulness for Existing Use in the planning process
- Licence numbers and (where applicable) EPC ratings must appear on every listing/advert for the property
Apply through Glasgow City Council
Applications are made directly to the council. This guide is a summary — always check the official page for the current fee and conditions.
Typical processing time: Glasgow's own licence page does not publish a specific target number of weeks. Under the national Order, the licensing authority has a statutory maximum of 9 months to determine a new STL application (higher for very high-volume periods) and a 21-consecutive-day statutory site-notice/objection period is built into that timeline, plus statutory consultation with Police Scotland, Scottish Fire and Rescue, the local Community Council and the ward's elected members. Treat "up to 9 months" as the honest worst case; the council does not commit to a faster typical turnaround in writing.
Official council licensing pageCommon questions
Frequently Asked Questions
What are the fees for a Glasgow short-term let licence in 2026?
Does Glasgow have a short-term let control area?
Do I need planning permission as well as a licence?
How long does a Glasgow STL licence last, and how do I renew?
How do I pay the licence fee?
What happens if my Short Term Let licence application is refused?
What documents does the application need?
Short-Term Let Licences in Other Councils
Council data last reviewed 2026-07. Fees and conditions are set by Glasgow City Council and can change — always confirm on the official council page before applying. This page is general information, not legal advice.