Council Licensing Guide · Scotland

How Much Does a Short-Term Let Licence Cost in Aberdeen City Council?

Application fees in Aberdeen City Council run £420–£2,980, plus the safety certificates every Scottish short-term let needs. Confirm current fees on the official council page.

Licence valid 3 years Mandatory since Oct 2023

Licence fees

Aberdeen City Council Fees

Fee band Application Renewal
1-2 guests £420
3-4 guests £630
5-6 guests £840
7-8 guests £1,120
9-12 guests £1,490
13+ guests £2,980

Published fee table (from the Council's official 'Short Term Lets Licensing Guidance Notes') is banded by guest/occupancy capacity and is IDENTICAL whether the licence is for Home Sharing/Home Letting or for Secondary Letting: 1-2 guests £420; 3-4 guests £630; 5-6 guests £840; 7-8 guests £1,120; 9-12 guests £1,490; 13+ guests £2,980. This fee covers licence processing (incl. public notices and committee referral if needed), the fit-and-proper-person check on everyone named, initial inspection(s) by the Private Sector Housing Team and Scottish Fire & Rescue (up to 2 additional inspections included), and random inspections/enforcement during the licence's life. Fees are reviewed annually and are non-refundable once a licence is granted; a partial refund may be considered if an application is withdrawn before grant, or if an application is refused and that refusal becomes final. The guidance labels this table 'fees for an initial application' - a separate renewal-specific figure is not itemised anywhere in the published guidance, so it is not confirmed whether renewal costs the same as a first application in the same capacity band (see uncertainties).

No separate planning permission needed

Aberdeen City Council has NOT designated a short-term let control area, and its official Guidance Notes say so explicitly: "No significant or city-wide issues are evident in Aberdeen and there is no intention to designate a control area at this time. However, if the need arises in the future, a Short-Term Let Control Area can be established." Because there is no control area, the automatic requirement (under s.26B of the Town and Country Planning (Scotland) Act 1997) for secondary-letting hosts to also hold/have applied for planning permission does NOT apply city-wide. Instead, Aberdeen's Planning department assesses each application "on a case-by-case basis" to decide whether a change of use to short-term let is material and needs planning permission; if planning permission is required and hasn't been obtained, the STL licence application is refused (classed "Refused to Considered").

Before you apply

Documents You'll Need

  • Completed application form naming the host/operator, all owners (all owners must consent if multiple), all company directors/partners if a business, and the day-to-day manager (who must be named as a licence holder - changing manager later requires a brand new licence)
  • Scottish Fire & Rescue Service (SFRS) checklist, completed by the applicant
  • For Secondary Letting: floor plans to a suitable metric scale (preferably 1:50) showing room layout, sanitary ware, cooking facilities, power outlets, lighting points/switches, and the maximum number of guests per bedroom
  • Evidence of current insurance: Public/Owner's Liability Insurance with minimum cover of £5m per dwelling, plus valid Buildings/Comprehensive insurance covering the short-term let activity
  • Current Electrical Installation Condition Report (EICR), from a NICEIC- or SELECT-registered contractor (renew at least every 5 years)
  • Current Portable Appliance Test (PAT) certificate for all plug-in appliances (renew at least annually)
  • Gas Safety / Certificate of Compliance for all gas pipes, flues and appliances, from a Gas Safe registered installer (only if premises has a gas supply) - current year plus previous 2 years' certificates needed for renewal
  • Energy Performance Certificate (EPC)
  • Legionella Risk Assessment (required regardless of whether premises has a private or mains water supply)
  • Fire Risk Assessment, Fire Policy, Fire Action Plan and Fire Log Book (records of alarm/emergency lighting/firefighting equipment testing)
  • Record showing upholstered furnishings/mattresses comply with the Furniture and Furnishings (Fire)(Safety) Regulations 1988
  • Planning permission (granted, or an undetermined application) if the Council's Planning team decides a licence application needs it
  • Building Warrant / Completion Certificate if works have required one (e.g. new fire detection/alarm system, new circuits)
  • Guest Information Folder kept on-site (certified copy of licence & conditions, fire/gas/electrical safety info, emergency contacts, current gas safety report, EICR, PAT report, EPC)

Safety certificates

Certificates Required

Your Aberdeen City Council licence application must be backed by current safety certificates. These are jobs for a certified assessor, and getting them booked early is the most common thing that holds an application up.

ReferralFree. We'll pass your details to a local certified assessor who covers your area.

Get your licence certificates sorted

A short-term let licence in Aberdeen City Council needs a set of safety certificates. Tell us about your property and we'll connect you with a local certified assessor for a no-obligation quote.

Gas Safety Certificate (annual, Gas Safe registered installer - only if there is a gas supply)Electrical Installation Condition Report (EICR) - renewed at least every 5 years, NICEIC/SELECT registered contractorPortable Appliance Test (PAT) Certificate - renewed at least annuallyEnergy Performance Certificate (EPC)Legionella Risk AssessmentPublic/Owner's Liability Insurance (minimum £5m cover per dwelling)Buildings/Comprehensive Insurance covering short-term let useFire Risk Assessment (plus Fire Policy, Fire Action Plan, Fire Log Book)

No obligation. Your details go only to a local assessor covering Aberdeen City Council.

Local conditions

Key Rules in Aberdeen City Council

  • No short-term let control area is designated in Aberdeen; the Council states it has no current intention to create one, though it could do so in future if problems emerge.
  • Four licence types: Home Sharing; Home Letting; Home Sharing and Home Letting combined; and Secondary Letting - you may only operate the type your licence was granted for, and a separate licence is needed for each individual premises.
  • Fee is set purely by guest/occupancy capacity band and is the same amount for Home Sharing/Home Letting as for Secondary Letting.
  • Aberdeen City Council does NOT grant temporary licences or temporary exemptions under any circumstance (policy reviewed annually).
  • The day-to-day manager (individual or company) must be listed as a named licence holder; because the legislation does not allow licence transfers, changing your day-to-day manager at any point requires a brand new licence application.
  • Everyone named on an application undergoes a 'fit and proper person' test.
  • Statutory consultees are Police Scotland and the Scottish Fire & Rescue Service; a 21-day period is allowed for their representations, and a Public Notice must be displayed at the property for 21 days with a compliance certificate completed online afterwards.
  • Public objections must be received in writing (signed) within 28 days of the Public Notice being displayed; any application that receives an objection must go to the Licensing Committee rather than being decided under officer delegated powers.
  • Two additional (discretionary) local conditions apply on top of the national mandatory conditions: managing anti-social behaviour (house rules, guest parking, noise) and waste/bin disposal management.
  • Operating without a licence is a criminal offence - default fine up to level 4 (£2,500) on the standard scale, though the Scottish Government intends to raise the maximum to £50,000 and add imprisonment as a last resort.
  • Listings/adverts must display the licence number and, where required, a valid EPC rating.
  • Licences run for up to 3 years; renewal is the licence holder's responsibility, though the Council may send a reminder before expiry.
  • Decisions can be appealed to the Sheriff by summary application within 28 days.

Apply through Aberdeen City Council

Applications are made directly to the council. This guide is a summary — always check the official page for the current fee and conditions.

Typical processing time: Up to approx. 39 weeks (9 months) for new host/operator applications; up to approx. 52 weeks (12 months) for existing host/operator applications - these are the statutory maximum determination periods stated in the Council's own guidance (a council can seek a sheriff-court extension if it needs longer). Simple, uncontested applications are typically decided well inside this window under officer delegated powers; anything drawing an objection must go to the Licensing Committee, which adds time.

Official council licensing page

Common questions

Frequently Asked Questions

How much does a short-term let licence cost in Aberdeen?
It's banded by how many guests the property is licensed for, and the same table applies whether you're doing home sharing/home letting or secondary letting: 1-2 guests costs £420, 3-4 guests £630, 5-6 guests £840, 7-8 guests £1,120, 9-12 guests £1,490, and 13+ guests £2,980. That covers processing, the fit-and-proper-person checks, and your initial Fire Service and housing inspections. Fees are reviewed annually so double-check the current figure before you apply, and they're non-refundable once the licence is granted.
Do I need planning permission as well as a licence in Aberdeen?
Aberdeen has not designated a short-term let control area, so you don't automatically need planning permission on top of your licence the way you would in Edinburgh. Instead, the Council's Planning team looks at each application case by case to decide whether your change of use is material. If they decide planning permission is needed and you don't have it, your licence application will be refused.
What documents and certificates do I need to apply?
You'll need an EICR (electrical safety report, valid 5 years), a current PAT certificate (renewed at least annually), a gas safety certificate if you have gas, an EPC, a legionella risk assessment, evidence of public liability insurance (minimum £5m per dwelling) and buildings insurance, and - for secondary lets - scaled floor plans showing room layout and maximum occupancy per bedroom. You also need to complete the Scottish Fire & Rescue Service checklist as part of the application.
How long does an Aberdeen STL licence application take to process?
The Council's own guidance gives itself up to 9 months to decide a new host/operator's application, and up to 12 months for existing operators, which are the statutory maximum periods under the licensing order. Straightforward applications with no objections are usually decided faster under officer delegated powers, but anything that draws an objection has to go to the Licensing Committee, which adds time.
How long does the licence last and when do I need to renew?
Up to 3 years. Renewal is your responsibility as the licence holder - Aberdeen City Council may send you a reminder before it expires, but don't rely on that; you need to reapply (with the same supporting documents, including up-to-date certificates) before the licence runs out.
Can I get a temporary licence or exemption if I'm only letting occasionally?
No. Aberdeen City Council does not grant temporary licences or temporary exemptions under any circumstances - this is reviewed annually alongside the wider policy, but as things stand you need a full licence even for occasional or short-notice letting.

Short-Term Let Licences in Other Councils

See all Scottish council STL licence guides →

Council data last reviewed 2026-07. Fees and conditions are set by Aberdeen City Council and can change — always confirm on the official council page before applying. This page is general information, not legal advice.